Fading West

INDUSTRIAL FACTORY AND OFFICES

COMPLETED: Projected to be completed November 2020
LOCATION: Buena Vista, CO
CONSTRUCTION COST: N/A
PROJECT AREA: 64,000 SF

The Fading West Development headquarters in Buena Vista, CO joins two buildings.  The 9,000 SF office building on the front, facing the Collegiate Peaks, is a post and beam steel structure. The 85,000 SF industrial factory is a prefabricated metal building.  In the factory portion, Fading West will manufacture prefabricated units for residential and commercial projects.  The crux of the project is the connection of the two buildings, which must be connected internally for circulation, but requires two fire walls and a 13″ seismic separation.

Comments are closed.